West Goshen Township will be milling and paving the following roads in a few weeks. We ask that anyone living on one of these roads take this time to check and make sure your trees and bushes are at least 15 feet high above the roads and at least three feet behind the edge of the roadway. If your vegetation is not out of the way it may be damaged during the paving operations. Overgrown limbs and shrubs may be trimmed by either the contractor or township crews while they are working. This will possibly delay the paving operations and may not be aesthetically pleasing. Also, please check that your mailbox, if mounted at the street is behind the face of the curb to prevent any damage to it. You will be notified by the contractor 24 hours in advance of any work. Thank you for your cooperation in helping make the paving operation go smoothly.
Streets | Begin At | Ending |
| | |
Richmond Rd | Paoli Pike | Dead end |
Thistlewood La | Richmond Rd | Hightop Rd |
Lotus La | Hightop Rd | Willow Way |
Gateway La | Dorothy La | Dead end |
Willow Way | Thistlewood La | Farmington Rd |
Holly Rd | Richmond Rd | Farmington Rd |
Farmington Rd | Richmond Rd | Cavalier La |
Cavalier La | Farmington Rd | Willow Way |
Hightop Rd | Paoli Pike | Cavalier La |
Fern Hill La | Paoli Pike | Paul La |
Dorothy La | Paoli Pike | Gateway La |
Paul La | Fernhill La | Wellington Rd |
Powell La | Paoli Pike | Isabel La |
Georgia La Both | Paoli Pike-Park La | Paul La-Isabel La |
Wellington Rd Both | Paoli Pike to Park La | Paul La-Isabel La |
Park La | Georgia La | Wellington Rd |
Veronica Rd | Paoli Pike | Isabel Rd |
Isabel La | Five Points Rd | Powell La |
St. James Rd | Isabel La | Paoli Pike |
North Five Pts Rd | Fernhill Rd | West Chester Pike |
South Five Pts Rd | West Chester Pike | Westtown Rd |